System: 200 tonne crane
Duration: 1 day This involved the erection of a pedestrian bridge followed by lifting over river to final position. Surrounding trees meant careful planning was required to ensure enough boom length to accommodate the site environment enabling the bridge to be manoeuvred around the trees. |