System: Three mobile cranes
Duration: Three days Radius proved again that the planning of any lifting operation is paramount to ensuring on the day that the project proceeds without hindrance. This forecourt canopy was built at ground level around the canopy bases followed by carefully lifting to the top of the columns ready for fixing. Three cranes lifting simultaneously enabled the erection team flexibility to lift the canopy and adjust it to the final position at the top of the columns as required. |