System: 350 tonne crane
Duration: 2 days

Large fuel tanks installed at Folkestone services. Weighing approx 40 tonnes and using a 350 tonne crane to unload the tanks and position into prepared area. The project was carried out over two days due to the crane having to be relocated to final position two tanks.